- earth works;
- formwork;
- rebar;
- concrete works;
- masonry;
- roofing;
- tinsmith works;
- carpentry;
- facing/tiling/paneling;
- plastering;
- floorings;
- glass works;
- painting;
- steel constructions;
- heat insulation;
- hydro insulation;
- noise insulation;
- frame and joinery fitting;
- fitting of exterior and interior doors;
- heating and ventilation;
- water-main and sewerage;
- roads;
- streets;
- pavements;
- electrical installations in the building;
- electrical installations in the adjacent exterior areas.
For us it is important there to be stages and coordination of the building-installation works so that the different teams are not into each other’s way but work in synchrony or one after the other when necessary.
This is exactly what allows us to work fast without making compromises with the quality of the execution.