We know how important the solid ground base is, for the building to remain stable.
During the process of construction site preparation, it is very important for the excavation to be as safe as possible and most importantly - it should not hold rainwater and melted snow for long periods of time, and the high groundwaters should be prevented from filling the trench.
This can be achieved through a system of drainage canals and drainage ditches, as well as with other methods.
We will offer you the best option for the drainage of the trench or for the complete drainage of the plot.
We know how to master the water and keep it at a safe distance from the main building and the adjacent communication systems.